The Labor Saving Skid Package
 This
custom skid package included an electro-polished stainless steel
boiler feed tank with a steam pre-heat tube with temperature
control, a control panel, a code blow down separator,
and a water softener built right into the pallet.
The customer placed this
skid in a boiler room as one complete package and only had to hire
labor to connect the water and drain supply lines to one complete
unit, saving thousands of dollars in labor. |
Polished Stainless Steel

Our customer placed this polished stainless steel condensate return
system in a food production area and wanted this unit
to match the rest of the facility.
Fabtek Areo offers a wide variety of finishes and materials based
on the needs of our customers. |
Economical
Solutions
This unit was custom built for a laundry and dry cleaning
customer using
the most economical components available. This unit includes a
stainless steel tank and a timed alternating control panel running
to of our
exclusive |
Other Custom Applications
Fabtek has had a wide variety of custom applications. Here are some
samples of how we can help almost any situation:
-
We had a customer who needed a 500 Gallon Boiler feed tank for
a 500 HP boiler. His problem was that he only had a 36 inch wide
opening
to fit it in. Our solution for him was to build an enormous stainless
steel box with the support framing on the inside. The result
was that the customer was able to slide his boiler feed tank
into his
room with a forklift without any modification necessary to his
building.
-
One of our customers requested a triangle shaped boiler feed
tank to fit in a corner of his boiler room.
|